Construction management glossary

Plain definitions of the terms builders, owners and lenders use to run a job, from the first estimate to closeout. Residential and commercial terms are both here, because the money and the schedule work the same way on either.

By the BYLD team. Last updated 12 November 2026.

Money and contracts

Allowance

A dollar amount set aside in the contract for an item that has not been chosen yet, such as tile or light fixtures. If the final choice costs more or less than the allowance, the difference is settled with the owner.

Budget

The planned cost of the job, broken down by cost code. It is the number every committed and actual cost is measured against.

Change order

A written, priced and approved change to the contract scope, price or schedule. It is not in force until the owner has approved it. How to track change orders.

Committed cost

Money the builder is obligated to pay under signed subcontracts and purchase orders, whether or not it has been invoiced yet.

Cost code

A category used to group costs, such as framing, electrical or site work. Estimates, budgets and invoices use the same codes so they can be compared line by line.

Cost-plus contract

A contract in which the owner pays the actual cost of the work plus a stated fee or percentage for the builder.

Draw schedule

The plan for when money is released during a job, tied to stages of completed work. Lenders and owners use it to pay out against progress. How draw schedules work.

Fixed-price contract

A contract with one agreed price for a defined scope, also called lump sum or stipulated sum. Cost overruns inside that scope are the builder's risk.

Guaranteed maximum price

A cost-plus contract with a ceiling, often shortened to GMP. The owner pays cost plus fee up to the cap, and the builder carries costs above it unless the scope changes.

Job costing

Tracking actual costs against the budget by cost code while the job is running, so a builder can see where the margin is going before the job ends.

Lien waiver

A signed document in which a contractor, subcontractor or supplier gives up the right to file a lien for the amount it has been paid. Waivers are usually collected with each payment.

Pay application

A contractor's formal request for payment for work completed in a period. On commercial jobs it is commonly submitted on AIA forms G702 and G703, with a schedule of values attached.

Retainage

A percentage of each payment, often 5 to 10 percent, that the owner holds back until the work is substantially complete. It is also called retention.

Schedule of values

A list that breaks the contract price into line items with a dollar value for each. Pay applications bill a percentage complete against each line.

Schedule

Critical path

The longest chain of dependent tasks in a schedule. A delay to any task on it delays the finish date. What to look for in scheduling software.

Float

The amount of time a task can slip without delaying the finish date. Tasks on the critical path have no float.

Lead time

The time between ordering a material or product and having it on site. Long-lead items such as windows and switchgear have to be ordered well before they are needed.

Lookahead schedule

A short-range schedule, usually two to six weeks, that shows what each trade is doing next. Superintendents use it to run the weekly coordination meeting.

Milestone

A fixed point in the schedule that marks a stage of the job, such as foundation complete or dried in. Draws and inspections are often tied to milestones.

Substantial completion

The point at which the work is complete enough for the owner to use the building for its intended purpose. It usually starts the warranty period and triggers release of most retainage.

Documents and preconstruction

As-built drawings

Drawings revised to show what was actually built, including changes made in the field. They are handed to the owner at closeout.

Estimate

The builder's calculation of what a job will cost, built from quantities, unit costs, subcontractor quotes and markup. What construction software costs.

Plan set

The drawings for a project: architectural, structural, mechanical, electrical, plumbing and site sheets. The plan set and the specifications together define the work.

RFI

A request for information. A formal question from the builder or a trade to the designer when the drawings or specifications are unclear or conflict.

Scope of work

A written description of what a contractor or subcontractor is responsible for doing, and what is excluded.

Selections

The finish choices an owner makes during a residential job, such as cabinets, flooring, plumbing fixtures and paint colors. Each selection is checked against its allowance.

Specifications

The written requirements for materials, products and workmanship that accompany the drawings.

Submittal

Product data, shop drawings or samples that a contractor sends to the designer for review before ordering or installing an item.

Takeoff

Measuring quantities from the plans, such as square feet of drywall or linear feet of trim, so they can be priced in an estimate. Takeoffs and AI.

Field and closeout

Certificate of occupancy

A document issued by the local building department stating that a building meets code and can be occupied.

Closeout

The last stage of a job: finishing punch items, collecting final lien waivers, warranties and as-built drawings, and handing the building to the owner.

Daily log

The superintendent's record of each day on site: weather, crews present, work completed, deliveries, visitors and problems. It is the record builders rely on when a dispute comes up later. What a daily log should include.

Punch list

The list of small items left to finish or fix before the job is complete. Each item needs a location, an owner and a due date. How to manage a punch list.

Warranty period

The period after completion during which the builder must correct defects in the work. One year is common, and some items carry longer terms.

Common questions

What is the difference between a change order and an allowance?

An allowance is money already in the contract for an item that has not been chosen yet. A change order changes the contract itself. When a selection costs more than its allowance, the difference is usually documented with a change order.

What is the difference between a draw schedule and a pay application?

A draw schedule is the plan for when money will be released as stages of work are finished. A pay application is the request for one of those payments, showing how much of each line in the schedule of values is complete.

What is retainage and when is it released?

Retainage is a percentage of each payment the owner holds back, often 5 to 10 percent. It is usually released at or shortly after substantial completion, sometimes with a portion kept until the punch list is closed. The contract sets the terms.